LanWin5 (NOR-13-1) Converter

TenneT will connect windfarms N-12.3 amd N-13.2 via Lanwin5(NOR-13-1) via the border corridor N-III through the territorial sea via the island of Baltrum to the search area Rastede. Wind farms will connect via 66 kV. Transmission is 525 kV and rated at 2 GW. Commissioning envisaged for 2031-32.
4C Offshore | Image Not Available
Name
LanWin5 (NOR-13-1) Converter
Status
Planned
Latitude
55.089°
Longitude
6.260°