4C Offshore Empowering Intelligence

DolWin4 Converter

Implementation of 66-kV direct connection concept. DolWin4 is a connection around 215 kilometers long. About 60 kilometers of it are at sea.  Grid connection at Hanekenfähr. The connection systems will go into operation in 2028 An cable will connect the DolWin Delta and DolWin Gamma platforms. Windfarms will connect via 66-kV direct connection concept.
4C Offshore | Image Not Available
Name
DolWin4 Converter
Status
Planned
Latitude
54.041°
Longitude
6.804°

Premium

ForeSEE Premium, our most popular subscription, gives you full access to use the ForeSEE WebApp which includes exclusive offshore wind, transmission and vessel reports, news and downloads.

Request a 30 minute Demo
Transmission Cable
Name
Number of Cables
Minimum Cable Length
Nominal Voltage
Comments